UTTORON
First slide

Location Advantages

  • Besides Baguihati Police Phari.
  • Stone through distance from Jagatpur Market
  • VIP Road- 1.4 kms
  • Ultodanga/Bidhannagar Station- 5 kms
  • Airport & DPS- 6 kms
  • Sector V- 10 km
  • Very well connected to VIP Road as well as to the New town Expressway near Narkel bagan    

Lift

Liftn test

Power Inverter Provision

Power Inverter Provision

24*7 Security

24*7 Security

Iron Removal Plant

Iron Removal Plant

FOUNDATION:

RCC framed structure.

SUBSTRUCTURE &SUPER STRUCTURE:

All rooms will be Vitrified tiles Stair and Lobby in Kota stone.

TOILET:

6”-0” dado made of Ceramic tiles .C.P. bath fitting, sanitary fitting of reputed standard.PVC cisterns of reputed make of ISI mark.Anti skid Ceramic tiles in floor.

WINDOW:

Aluminum sliding with clear glass panels.

DOOR & DOOR FRAMES:

Salwood frame and commercial Block Board Flush Door and main door teak wood finish with teak polish. Synthetic door and frame in toilets.

SIDE PASSAGE:

Will have I.P.S. flooring.

WATER SUPPLY:

24 hours water supply.

ELECTRICAL:

Separate meters for each flat will be provided upon payment of security deposit to the concerned agency. Concealed ISI Copper wiring with reputed make Switches.

WALL:

Internal wall Plaster of Paris finish. External Wall Waterproof Paints Internal door panel Synthetic enamel.

ROOF:

Common roof with special Treatment.

ELEVATOR:

5 passengers Lift of reputed make.

PRICING & PAYMENT DETAILS

PRICING & PAYMENT PLAN

Name of the project

Uttoron

Location

Kestopur, Jagatpur

Booking amount

Rs. 2,00,000/-

Normal units

Rs. 2850/- per sq ft

Transformer & Meter Connection Charges

On actuals

Goods & Services Tax (GST)

As applicable

Maintenance Charges

To be paid on Possession

 

Payment Plan - Instalment

 

No of Instalment

Payment Stage

Due

1

Application/Earnest Money

Rs. 2,00,000/-

2

On or before  execution of the sale agreement of the said unit (within 15 days of date of the application)

70% (Less Application Money)

3

On or before Installation of Doors & Windows

 10 %

4

On or before  commencement of Electrical & Sanitary fittings

 10 %

5

On possession of the Said unit + Extra cost

 10 %