PURPLE SUNFLOWER
First slide

Location Advantages

  • Airport: 14 kms 
  • Railway Station: 8 kms 
  • School: 1 km (Siksha Niketan School)
  • Hospital: 3.5 kms
  • Stone throw distance from 215A bus stand
  • Stone throw distance from Technopolis (Forum Group)
  • Close proximity to DLF1, Hometown, Axis Mall & Aquatica Water Kingdom. 

Iron Removal Plant

   

24 Hours water Supply

   

Children Play Area

                 

Lift

   

Power Back up

Security

Parking

Community Hall

FOUNDATION:

RCC framed structure

SUBSTRUCTURE &SUPER STRUCTURE:

Reinforced concrete manufactured Portland Cement Steel reinforcement bar. (ISI).

BRICK WORK:

Outside 8” and inside 5”& 3” brick work.

FLOORING:

All rooms will be Vitrified tiles Stair and Lobby in Kota stone.

KITCHEN:

Kitchen top with Green marble and stainless sink. Glazed tiles dado up to 2”-6” height.Anti skid Ceramic tiles in floor.

TOILET:

6”-0” dado made of Ceramic tiles .C.P. bath fitting, sanitary fitting of reputed standard.PVC cisterns of reputed make of ISI mark.Anti skid Ceramic tiles in floor.

WINDOW:

Aluminum sliding with clear glass panels.

DOOR & DOOR FRAMES:

Salwood frame and commercial Block Board Flush Door and main door teak wood finish with teak polish. Synthetic door and frame in toilets.

SIDE PASSAGE:

Will have I.P.S. flooring.

WATER SUPPLY:

24 hours water supply.

ELECTRICAL:

Separate meters for each flat will be provided upon payment of security deposit to the concerned agency. Concealed ISI Copper wiring with reputed make Switches.

WALL:

Internal wall Plaster of Paris finish. External Wall Waterproof Paints Internal door panel Synthetic enamel.

ROOF:

Common roof with special Treatment.

ELEVATOR:

5 passengers Lift of reputed make.

PRICING & PAYMENT DETLS

PRICING & PAYMENT PLAN

Name of the project

Purple Sunflower

Location

Mahisbathan, Saltlake

Normal units

Rs. 4000 / Sq Ft

Car parking

Rs. 4,00,000/-

Two Wheeler Parking

Rs. 50,000/-

Transformer & Meter Connection Charges

On actuals

Goods & Services Tax

As applicable

Maintenance Charges

To be paid on Possession

Payment Plan – Instalment (Block 2 Coral)

SL.

Payment Stage

Due

1

Application/Earnest Money

Rs. 2,00,000

2

On or before  execution of the sale agreement of the said unit (within 15 days of date of the application)

40 % (less Application Money)

3

On or before commencement of 4th  floor casting of the said tower

8 %

4

On or before  commencement of brickwork of the Said Flat

8 %

5

On or before  commencement of Electrical & Plumbing lines of the Said Flat

8 %

6

On or before  commencement of POP of the Said Flat

8 %

7

On or before  commencement of Flooring of the Said Flat

8 %

8

On or before Installation of Doors & Windows of the Said Flat

7 %

9

On or before  commencement of Electrical & Sanitary fittings of the Said Flat

7 %

10

On possession of the said unit + Extra cost

 6 %

Payment Plan – Instalment (Block 1 Lily)

SL.

Payment Stage

Due

1

Application/Earnest Money

Rs 2,00,000

2

On or before  execution of the sale agreement of the said unit (within 15 days of date of the application)

20 % (less Application Money)

3

On or before commencement of Foundation of the said tower

7 %

4

On or before commencement of Ground floor casting of the said tower

7 %

5

On or before commencement of 2nd  floor casting of the said tower

7 %

6

On or before commencement of 4th  floor casting of the said tower

7 %

7

On or before commencement of brickwork of the Said Flat

7 %

8

On or before commencement of Electrical & Plumbing lines of the Said Flat

7 %

9

On or before commencement of POP of the Said Flat

7 %

10

On or before commencement of Flooring of the Said Flat

7 %

11

On or before commencement of outside plaster of the Said tower

7 %

12

On or before Installation of Doors & Windows of the Said Flat

6 %

13

On or before commencement of Electrical & Sanitary fittings of the Said Flat

6 %

14

On possession of the said unit + Extra cost

                 5 %